Views: 651 Author: Site Editor Publish Time: 2015-09-29 Origin: Site
Project Name: West-East Gas Pipeline Crossing project
Project location:Shiyan city in Hubei Province
Pipe Specification:Φ406.4mm×7.9mm straight saw pipe by strengthening three layer PE anti-corrosion
Construction Equipment: GD3500-LS HDD Machine and GD6000-LLS HDD Machine
Crossing length:2119.8m
Soil condition: granite,group of fault zones,the sand layer ,Moderately weathered rock and thick soft soil layer (including a lot of pebbles)