GD3500-LS HDD Machine in Liquefied Natural Gas Pipeline Crossing project in Hongchao River Guangxi Province

Views: 472     Author: Site Editor     Publish Time: 2015-12-09      Origin: Site

Project Name: Liquefied Natural Gas Pipeline Crossing project

Project location

Pipe Specification:Φ813mm

Construction Equipment GD3500-LS HDD Machine

Crossing length980m

Soil condition: Sand,rock,Shale and sand stone

Project Description:

This project get through the Hongchao River ,and the oil condition is so bad ,Part of the rock hardness up to 80 Mpa.