Global Goodeng           Search

GD5000-LLS HDD Machine in Harbin City – Liaoning Province Gas transmission pipeline project in Changchun city and Shenyang city

Views: 12     Author: Site Editor     Publish Time: 2015-11-18      Origin: Site

Project Name Harbin City – Liaoning Province Gas transmission pipeline project.
Project location:Changchun city and Shenyang city
Pipe Specification:Φ1016mm*21mm,Φ114 Cable pipe
Construction Equipment: GD5000-LLS HDD Machine
Crossing length:1515m
Soil condition: Sand、Rock
Project description: This project cross Daliaohe River, and get through Changchun, Gongzhuling city, Siping city, kaiyuan city, Tieling city, Xinmin city
the total crossing length is more than 1515m.


77067461a0fba50094a31ced16136eb


e6058252a9ff333367e58077a5e78e1


c1e6cd9c9e9c808a3ab39c5a77dadd5


2623dd2a9e68f6e1d548a7bf5ded994


334bfe6483ec4821cd1510cb9455787