2022-09-16
Construction site:Jiangsu province, ChinaMaterial and specification of main pipe:900mm, PECrossing length:300mHDD machine Model:GS1000-LS Read More
2016-07-26
1、 Project profileThis project is CPC Corporation, Taiwan second natural gas pipeline, which reduces Taichung natural gas operation interruption risk, it mainly crosses Taichung port channel, steel pipe material, diameter Ø660mm, crossing length 1449m.Owner party: CPC Corporation, TaiwanConstructio Read More
2015-12-17
Project Name: Cambodia International Airport Pipeline Crossing ProjectProject location:Cambodia International AirportPipe Specification:Φ500mmConstruction Equipment:GD450-LS HDD MachineCrossing length:500mSoil condition: Clay、Gravel Read More
2015-11-28
Project Name:Natural Gas Pipeline Crossing ProjectProject location:Wuhu City Anhui ProvincePipe Specification:Cable pipe D813 steel pipeConstruction Equipment:GD1600-LS HDD MachineCrossing length:880mSoil condition: Clay、Sand、Rock Read More